Connect project delivery to internal priorities.
Give each reviewer what they need to decide. Prepare a sponsor decision that reflects finance and operations requirements.
Answer leadership with a position you can explain. Show which project needs a decision and which needs better evidence.
Retain the knowledge the operating team needs. Give facilities the accepted records and unresolved actions at handover.
From a project change to a business decision.
Illustrative scenarios using supplied project records and your review criteria. Your team checks the findings and makes the decisions.
Give each reviewer what they need to decide.
Bring cost and operating impact into the same request.
Assemble the proposed change, supplied cost assessment and operating implications against your internal criteria. Identify the missing inputs and the people responsible, then prepare a decision pack for the authorised review.
Workplace change request
The revised layout has a cost assessment, but its effect on the agreed move plan is unconfirmed.
- Finance input
- The supplied estimate identifies the additional fit-out cost. (Supplied)
- Operating input
- Operations has not confirmed the revised move sequence. (Missing)
- Sponsor decision
- Resolve the operating condition before presenting the change for approval. (Pending)
Answer leadership with a position you can explain.
Keep the date and limits of each input visible.
Prepare a concise leadership review from supplied project updates and recorded decisions. Identify changes, open approvals and stale inputs so the sponsor can direct attention without mistaking an old position for a current one.
Steering review
The office move needs a scope decision; the refurbishment update has not been refreshed.
- Office move
- The layout change awaits the business sponsor’s decision. (Decision)
- Refurbishment
- The available report predates the latest site review. (Refresh)
- Leadership action
- Confirm the scope choice and request the missing current position. (Next steps)
Retain the knowledge the operating team needs.
Prepare the asset’s next working life.
Review specifications, operating documents, training evidence and open issues against the facilities team’s requirements. Prepare a handover register that distinguishes received material from accepted evidence and assigns the remaining actions.
Facilities handover
The equipment information is available, but operator training and one warranty remain outstanding.
- Operating documents
- The supplied manuals match the recorded equipment selection. (Received)
- Open requirements
- The training record and specified warranty are absent. (Outstanding)
- Facilities review
- Assign the missing items and confirm what can be accepted. (Review)
Start the next project with clear expectations.
Reuse the criteria, then adapt them to the site.
Apply your existing brief and submission requirements to the new project’s operating context. Identify the site-specific questions and confirm the reviewers before mobilising the team, so reusable standards support the actual business need.
New refurbishment brief
The organisation’s standard brief needs an occupied-site sequence before mobilisation.
- Reusable requirement
- The organisation specifies the evidence required at each review. (Standard)
- Site condition
- Business activity must continue during the refurbishment. (Specific)
- Mobilisation decision
- Confirm the operating constraints and review responsibilities with the sponsor. (To agree)
The tools behind these decisions
Connect your project record with OPUS Core, Agent, List and Editor.
OPUS Core
Keep the brief and governing project documents available to the delivery team.
Agent
Investigate the latest supplied position and identify what remains unconfirmed.
List
Track facilities requirements, evidence status and remaining responsibilities.
Editor
Prepare the sponsor’s paper with the inputs each function must review.
Frequently asked questions
A first review can use authorised records from the systems your organisation already relies on. Agree which source governs each input and where the final decision is retained. Confirm any required connection separately; the useful starting point is one sponsor decision supported by a clear intake and update process.