Architecture & design studios

Keep your design intent clear through every change. Protect the work and the fees behind it.

A design develops through client choices, consultant advice and technical constraints. When the reasons behind a decision disappear between revisions, the studio spends time recovering the argument and risks losing what made the proposal right.

OPUS connects the brief, governing drawings and recorded decisions to your review criteria. Resolve conflicting feedback, explain design trade-offs and make additional scope visible before your team undertakes it.

Architecture studio meeting room with a building model on the table.

Give design decisions a stronger foundation.

Resolve conflicting feedback before redesign begins. Identify the client choices that must precede drawing changes.

Carry the design intent into the next decision. Make the design trade-off clear to the client and delivery team.

Make additional work visible before you undertake it. Prepare the scope conversation while the new request can still be agreed.

Explore all four use cases

From a changing brief to a clear design position.

Illustrative scenarios using supplied project records and your review criteria. Your team checks the findings and makes the decisions.

Resolve conflicting feedback before redesign begins.

Give the next revision a clear direction.

Consolidate supplied comments against the relevant drawing issue. Identify conflicting instructions and departures from the brief, then prepare the decisions to resolve before assigning the next revision to the design team.

Revision brief

Two comments ask for incompatible changes to the same approved layout.

Approved brief
The client’s agreed requirement retains a dedicated reception area. (Reference)
Conflicting feedback
A later email requests more seating within the same space. (To resolve)
Design decision
Confirm the priority with the client before revising the plan. (Required)

Carry the design intent into the next decision.

Explain what a substitution would change.

Compare a proposed alternative with the approved design criteria and supplied specialist input. Prepare a brief that explains the intended quality, the change and the unresolved technical or cost questions, so the client can weigh the trade-off.

Material substitution brief

The proposed cladding changes the joint pattern that supports the approved facade composition.

Design intent
The approved elevation records the continuous joint alignment. (Reference)
Proposed alternative
The supplier’s module changes that alignment; the technical assessment is pending. (Difference)
Client choice
Present the visual consequence and outstanding assessments before acceptance. (Review)

Make additional work visible before you undertake it.

Protect the fees behind the design.

Compare a new request with the appointment and previous approvals. Prepare the scope difference and a draft proposal using your fee and programme assumptions, so the studio can agree the work with the client before proceeding.

Additional-services proposal

The client requests another layout option after approving the completed stage.

Appointment
The supplied scope defines the agreed design stages and deliverables. (Reference)
New request
A further option follows the recorded approval of the current stage. (Assess scope)
Proposal
The studio supplies the fee, timing and conditions for client agreement. (Draft)

Know what is ready to issue.

Keep completeness and technical acceptance distinct.

Review the supplied package against your brief, issue checklist and defined submission requirements. Identify missing documents, conflicting revisions and outstanding specialist input so the responsible architect can decide whether to issue or hold the package.

Stage issue review

The document set is assembled, but one consultant response remains provisional.

Package record
The supplied register identifies the drawing revisions proposed for issue. (Recorded)
Specialist input
The services coordination response is still provisional. (Outstanding)
Issue decision
The responsible architect reviews the gap before authorising the package. (Pending)

The tools behind these decisions

Connect your project record with OPUS Core, Agent, List and Editor.

OPUS Core

Retain the appointment, submissions and approvals behind a scope review.

Agent

Investigate comments against the governing brief and drawing revisions.

List

Structure issue requirements, missing evidence and responsible reviewers.

Editor

Explain a design option with its rationale, evidence and open questions.

Frequently asked questions

Yes. Files brings project working formats into a shared record, and Agent can use available project information to prepare a review. Keep the official drawing issue and revision process clear. Reading CAD or BIM material does not establish model authoring, clash detection or every form of technical analysis.

Put one design decision into focus.

Bring the brief, the competing options and the questions still open. See how OPUS helps your studio prepare the case.

Your projects. Your questions. Our team.